Production line at port

Posted by Joyce van Heijzen to Installation, 2009-09-30 10:12:59

The expectations are that a lot of offshore wind turbine fields are going to be installed, why not start working together in the supply chain.
Starting a cooperation with a wind turbine manufacturer, foundation manufacturer and a port
will make it possible to start a production line at the port.
This will reduce the transport needed to get big structures to the port and will reduce production time because less handling is needed.